Case study
Leading 237 reservists to the army’s top grade
Six years running a 237-strong reservist company. I built the routines, ops room and training model behind a top evaluation grade, then handed over a company that keeps running them.
Role
Officer Commanding, Captain (NS), Delta Company, 39 SCE
Period
2019 — 2025
Outcome
Top readiness grade (REDCON 1, 86.53%) · systems still in use after handover
86.5%
evaluation score, earning the top readiness grade; most companies get the one below

Context
237 reservists, two to three weeks a year.
For six years of National Service, I was Officer Commanding of Delta Company, 39th Battalion, Singapore Combat Engineers, the battalion I first joined as a soldier. Four platoons plus medics, signallers, vehicle technicians, transport, admin and logistics: 237 men on the roll, a company (+) in army terms. Reservists leave their jobs and families to come in for two to three weeks a year. I set one rule for the command team: if we take their time, it has to be worth it.

Their time
If we do it only because it’s the standard, find a better way.
We did as much as we could before anyone reported in. Instead of carrying field packs into camp for a full company layout, the men photographed them at home next to that day’s newspaper, which saved more than 200 people the trip. I printed bunk labels before every ICT so nobody went hunting for small door signs. It was design training, applied to a camp. When COVID split us into small groups, I built a digital company calendar and recorded the final debrief on Loom, played in three rooms at once. I visited each room at the end for questions. It saved about 200 people 20 minutes of waiting.
The system
Train the way the evaluation will run you.
Our evaluation, ETES (the Engineers’ version of ATEC), was split across my fifth and sixth ICTs. So I split the company into planning and operations. The officers planned, with a walkthrough of every day before the ICT and a stand-up each evening to set the next day. The platoon sergeants ran training on the ground. I stayed in the operations room on purpose. I designed it, and my two 2ICs built most of it. It had a log of every incoming message, timelines that prompted platoons for information before they needed it, and supply tracking so we could push resupply before anyone ran low. Two projectors kept everyone looking at the same picture.

The training
From 30 fixes to three.
I 3D-printed vehicles and soldiers for tabletop exercises: 6 cars, 3 trucks and 30 figures. On a printed map, platoons placed every vehicle and every man, and the pieces became central to how they planned. In week two of our last ICT, I moved us from drilling components to running full missions. Each day one platoon ran a mission, one planned on the tabletop, and one observed and added manpower. Every evening, the trainers, observers and training-centre instructors met for an after-action review. After two days the list of fixes had grown to 20 to 30, so we cut it to the top three for the men and the top three for the commanders.

Result
The top grade, at 86.53%.
Assessment is partly about impressions, so a grade is mostly earned in the weeks before the test. I met the training centre early to agree how we would run against their marking criteria, so a good result for us was also a good result for them. We scored 86.53%, above the usual 85% bar, for REDCON 1, the top readiness grade; most companies get a 2. Active companies and the battalion came to see our ops room, and the battalion borrowed the tabletop pieces and asked to buy sets. The vehicle technicians, who in my first ICT had asked why they were even there, gave me a thank-you card.

Handover
Systems outlive people.
No one handed over to me when I took the company. So in my last ICT, I let my 2IC run the plan and the ground with me as backup, while I prepared the company for an evaluation I wouldn’t be there for. The company still sets up the ops room every ICT and still inspects field packs by photo. I printed a small figurine for everyone in the company as a thank-you. By the end, my job was to set direction, decide what to drop, and hand execution to the people on the ground.

Takeaway
Systems outlive people. In a big organisation I don’t just fix the problem in front of me; I build the routine that keeps fixing it after I’ve left.
→
Say hi